Volumes and case counts: how many cases, how often?

Intermediate 9 min read · Updated November 14, 2026

The case count says how often a process runs in a given period, for example 1,000 invoices a month or 120 orders a week. Without it you can describe a process, but you cannot say what it costs per year, how many people it needs or where it overloads. Collect it per period, note peaks separately and record the shares at every decision.

Why the volume matters more than the diagram

A process map shows what happens. The volume decides whether it matters. A step that takes ten minutes is irrelevant at twenty cases a month and fills a full-time position at two thousand. Cost per year, staff demand, utilization and the bottleneck all depend on the case count; the lead time of a single case does not.

That is why a sound process analysis collects a small set of figures alongside the drawing: cases per period, the share of cases at each decision and, where relevant, the share of each case type. In ERP and digitalisation projects these figures are usually called the volume figures or transaction volumes, and they belong in the requirements specification just as much as the process description.

Three ways to get the case count

In practice you rarely measure from scratch. Use the best source available and say which one you used:

Define the case before you count. Is it one invoice or one supplier statement with ten invoices? One applicant or one vacancy? Counting the wrong unit makes every later figure wrong by the same factor.

Peaks, seasons and the normal period

Office work is rarely even. Invoices pile up at month end, applications arrive after a job advert goes online, complaints follow a delivery problem. An average hides this. Record the normal volume as the basis and note the peak separately: "1,000 invoices a month, in the last week of the month about a third of them".

For staffing decisions the peak is often the more important figure, because a team that copes on average can still be overloaded for one week every month. A practical approach is to calculate the process twice, once with the normal and once with the peak volume, and compare utilization in both. The staffing calculator does this in seconds.

Converting between periods

Volumes come in different periods: per day, per week, per month or per year. The app stores the case count with its period and converts it using the working days per year (default 220, the days left after weekends, public holidays and annual leave) and the working hours per day (default 8).

Example conversions
GivenCases per yearWorking days in the period
1,000 invoices per month12,00018.33
120 orders per week6,2404.23
300 requests per month3,60018.33
cases per year = cases per day × working days per year = cases per week × 52 = cases per month × 12 working days per month = 220 ÷ 12 = 18.33 working days per week = 220 ÷ 52 = 4.23
Working days, not calendar days: capacity is calculated from working time. If your team works a different number of days per year, change the default in the process settings, otherwise utilization will be off.

Shares at decisions are part of the volume

The case count alone tells you how many cases enter the process. The shares at decisions tell you how many take each path. In the worked invoice example, 20% of invoices are incomplete and go back to the supplier, and 30% are above €5,000 and need an approval. Only with these shares can the app work out that the check step runs 1.25 times per case and the approval 0.3 times, which is the basis for correct times and costs. How this works in detail is explained in Branches and loops.

Ask for shares the same way as for volumes: "Out of ten invoices, how many are incomplete?" People find ratios of ten much easier to estimate than percentages.

Volume figures in ERP requirements

When a process is mapped ahead of an ERP selection or a workflow project, the volume figures are a requirement in their own right. A vendor needs to know whether the system must handle 50 or 5,000 invoices a month, how many order lines a typical order has and how often exceptions occur. Typical entries are:

Try it with the purchasing template

The purchasing template starts with 500 requisitions a month and contains two decisions with shares: 30% of requisitions are above €1,000 and need approval, and 10% of those are rejected. Change the case count in the settings and watch cost per year, staff demand and utilization follow immediately, while the lead time of a single case stays the same. That is the clearest way to see what the volume does and does not influence. For the step from volume to people, continue with Staffing calculation.

Try it in the editor

Purchasing via purchase requisition · 500 / month

The purchasing template starts with 500 requisitions a month and shows how shares at the approval decisions affect cost and staff demand.

Open the example in the editor

Free, no sign-up, in your browser. Lead time, cost and utilization are calculated while you draw.

Matching calculator

Staffing calculator: cases and processing time

Calculate staffing from case volume and processing time: full-time equivalents, utilization and backlog per period. Free calculator, queries included.

Frequently asked questions

What if nobody knows the case count?

Ask for an estimate with a range ("between 30 and 50 a day") and note that it is an estimate. Then check whether a system can provide the real figure later. A rough value lets you calculate today; an empty field blocks every capacity and cost figure.

Should I use the average or the peak?

Use the normal volume as the basis and calculate the peak as a second variant. Average figures are right for annual costs; peak figures are right for the question whether the team copes in the busiest week.

Do I need volumes for every step?

No. You need the volume at the start and the shares at decisions. The app derives how often each step runs per case from these, including loops.

What is a workload analysis?

A workload analysis compares the work a process generates with the time available to do it. It needs exactly the figures described here: cases per period, processing time per case and available capacity per role.

Self-test

1. How many cases per year are 120 orders per week?
Weekly volumes are multiplied by 52: 120 × 52 = 6,240.
2. Which figure does the case count NOT change?
The lead time of one case depends on times and shares, not on how many cases there are. Waiting caused by overload is not part of the instant calculation.
3. What should you do first before counting cases?
If the unit is unclear, for example one invoice versus one statement with several invoices, every figure based on the count is distorted.

Keep learning

Would you like to map or improve a process together with us? Contact